How to make the frame for the ceiling plasterboard

How to make a frame for the ceiling plasterboard

Because of the uneven ceilings of homes residents have to align the ceiling with drywall.

In turn, the drywall is attached to the metal frame, which stiffens the whole structure.

For the frame, various metal profiles, which you buy in the market or in DIY stores.

Many have their profiles have perforations, which is distributed by the profile element in order.

You will need

  • - Guiding potolochnye-
  • - Profile udliniteli-
  • - kraby-
  • - Plug-gvozdi-
  • - samorezy-
  • - perforator-
  • - shurupovert-
  • - screwdriver-
  • - uroven-
  • - Cord spacing.

instructions

1

To make the most of the ceiling drywall, You need to be able to work hammer, screwdrivers and scissors for metal. for mounting of the frame ceiling for drywall spend with the assistant because one deal with this kind of work will be difficult.

2

First decide the coverage. What lights you prefer halogen or point? It depends on how far you lower the ceiling of the future. Most minimum distance from the ground ceiling before drywall is 10 cm. Then proceed to the perimeter of the room layout on a level for further installation guide profile (PPP 28h27).

3

Take level (preferably 150 or 200 cm)put it on the leveled so that the bubble was strictly in the middle. Spend a prominent line on the wall and proceed to the next section. So do around the perimeter of the room. When you do this work, proceed to the installation guide profile TNG.

4

The guide serves as a profileguiding element for ceiling profiles, and attached to the wall using dowels, nails. Drill punch a hole in the wall, take a guide profile, and set it to the wall (hole on the profile and the wall must be the same), fix the profile with the help of dowel-nails. If the width of the wall does not allow to accommodate a user's profile, measure its length and the remainder cut with scissors for metal.

5

When you set the guide profile (PPP), the next stage of the work will be marking ceiling for direct hangers, which are used to holdCeiling Profile (PP 60h27) on weight. To do this, place a check mark on the ceiling from the edge of the wall and make the same mark on the opposite side. Stretch lace, breaded in better blue, between the marked points and repel it. On a surface ceiling left a trail that would be a reference point for direct mounting hangers. The next mark is made 50 cm from the initial point.

6

After you have marked the entire ceiling, proceed to direct fasteners suspensions. Take the suspension at each side, its cue from the ceiling and using the punch make a hole in the surface ceiling. Suspensions are attached to the ceiling by means of specialdowel-nails, which are sold specifically for such work. Do not use a conventional dowel-nails - they can not keep the frame after installation of gypsum ceiling.

7

The next stage of work - installation of ceiling profiles (PP 60h27). Ceiling profiles are a major element of the metal frame ceiling. They carry the whole load drywall. Therefore, please note the distance between them is veryexactly. Insert the ceiling profile (PP) in the guide profile (PPP), then slide it between the bent side bands suspension of direct and secure it with the screw on the metal. Try to use the level as often as possible in your work. If you need additional length of the profile, then you connect them together using a special profile extension. A longitudinal profile ceiling mount to the ceiling profiles cross with a special tool - the crab, which fixes these profiles to each other with screws. After the sequential execution of all the works of your frame is ready for plating ceiling plasterboard.